Chapter 66: Design in agile teams

Part 11 · Interaction and product design3 min read

Most software is now built by teams that ship in cycles of a few weeks. Design work fits awkwardly into that rhythm: research and exploration take longer than a sprint, but a design finished months ahead goes stale. Planning, estimation and the wider comparison with waterfall are in → 91 Project and delivery management.

Agile, Scrum and Kanban

Agile is a family of software development approaches, not a single method. Its reference point is the Agile Manifesto, written by 17 developers in Utah in February 2001. It values people and conversation over process and tools, working software over exhaustive documentation, collaboration with customers over contract terms, and responding to change over sticking to a plan.1

Scrum is the most common way of putting this into practice. Work happens in sprints, fixed periods of one month or less. A Product Owner orders the backlog (the list of work), a Scrum Master looks after the process, and the developers build. Each sprint has planning, a daily check-in, a review and a retrospective.2 Ken Schwaber and Jeff Sutherland first presented Scrum in 1995. The name comes from a 1986 Harvard Business Review article by Hirotaka Takeuchi and Ikujiro Nonaka, who compared overlapping product teams at Japanese companies to a rugby scrum.3

Kanban manages work as a continuous flow instead of in sprints. Items move across a visible board, and the team caps how much work in progress it allows, so new work starts only when something finishes.4 The idea comes from Toyota, where a kanban card told each process which parts to make, how many and when; Toyota used kanban in all its plants from 1963.5

In Scrum, design work has to be sized to fit a sprint or planned ahead of one. On a Kanban board it can be a column of its own, with its own limit.

Dual-track agile

Dual-track agile is running discovery (finding out what is worth building) and delivery (building it) in parallel. The best-known early account is Desirée Sy’s 2007 paper on her team at Alias, later part of Autodesk. Interaction designers prototyped and usability-tested designs at least one cycle ahead of the developers and did contextual inquiry at least two cycles ahead.6

Cycle 0Cycle 1Cycle 2Cycle 3 DesignertrackDevelopertrack Requirements,site visits Setup, low-designfeatures Design and testfor Cycle 2;inquiry for Cycle 3 Build Design and testfor Cycle 3;inquiry for Cycle 4;test Cycle 1 build Build Same pattern;test Cycle 2 build Build Validated designs Working build to test After Sy (2007)
Figure 66.1 Design runs one cycle ahead of development and tests the previous cycle’s build.

Marty Cagan named the pattern dual-track agile in 2012, and Jeff Patton took up the term.7 Patton’s warning is the one to remember: “Two tracks, not two teams.”8 Developers who join discovery catch infeasible ideas early, and designers stay in delivery to answer questions as the build happens (→ 90 Multidisciplinary teams). Cagan has since dropped the name in favor of continuous discovery and continuous delivery.7

Design debt

Design debt is the accumulated cost of design shortcuts in a shipped product: inconsistent components, untested flows, accessibility left for later. It borrows Ward Cunningham’s 1992 metaphor, which compared shipping first-version code to taking on debt that must be repaid.9 Nielsen Norman Group writes about it as UX debt; in use the two terms are near-synonyms. Its advice is to log each item in the backlog with its severity, then fix one or two every sprint or run a periodic cleanup sprint.10 A design system slows how fast new debt builds up (→ 65 Design systems).

See also

91 Project and delivery management · 3 Design processes · 53 Usability testing · 65 Design systems · 90 Multidisciplinary teams · 85 Analytics, experiments and data-informed design

Sources

  • Beck, K. et al. (2001). Manifesto for Agile Software Development. agilemanifesto.org.
  • Cagan, M. (2012). “Dual-Track Agile.” Silicon Valley Product Group.
  • Coleman, J., Vacanti, D. et al. (2025). The Kanban Guide, v2025.5.
  • Cunningham, W. (1992). “The WyCash Portfolio Management System.” OOPSLA ‘92.
  • Kaley, A. (2018). “UX Debt: How to Identify, Prioritize, and Resolve.” Nielsen Norman Group.
  • Patton, J. (2017). “Dual Track Development is not Duel Track.” Jeff Patton & Associates.
  • Schwaber, K. and Sutherland, J. (2020). The Scrum Guide.
  • Sy, D. (2007). “Adapting Usability Investigations for Agile User-Centered Design.” Journal of Usability Studies 2(3), 112–132.
  • Takeuchi, H. and Nonaka, I. (1986). “The New New Product Development Game.” Harvard Business Review.
  • Toyota Motor Corporation (n.d.). Toyota: 75 Years.

Notes

  1. Beck, K. et al. (2001). “Manifesto for Agile Software Development” and “History: The Agile Manifesto.” https://agilemanifesto.org/ and https://agilemanifesto.org/history.html ↩
  2. Schwaber, K. and Sutherland, J. (2020). The Scrum Guide, November 2020. https://scrumguides.org/scrum-guide.html ↩
  3. Takeuchi, H. and Nonaka, I. (1986). “The New New Product Development Game.” Harvard Business Review, January 1986. Summary at https://www.scrum.org/resources/new-new-product-development-game; first presentation of Scrum at OOPSLA 1995 per Schwaber and Sutherland (2020). ↩
  4. Coleman, J., Vacanti, D. et al. (2025). The Kanban Guide, version 2025.5. https://kanbanguides.org/english/ ↩
  5. Toyota Motor Corporation (n.d.). Toyota: 75 Years, “Production system.” https://www.toyota-global.com/company/history_of_toyota/75years/text/entering_the_automotive_business/chapter1/section4/item4.html ↩
  6. Sy, D. (2007). “Adapting Usability Investigations for Agile User-Centered Design.” Journal of Usability Studies 2(3), 112–132. Copy at https://www.slideshare.net/slideshow/adapting-usability-investigations-for/49227731 ↩
  7. Cagan, M. (2012, September 17). “Dual-Track Agile.” Silicon Valley Product Group, with later update note. https://www.svpg.com/dual-track-agile/ ↩ ↩
  8. Patton, J. (2017, May 10). “Dual Track Development is not Duel Track.” https://jpattonassociates.com/dual-track-development/ ↩
  9. Cunningham, W. (1992). “The WyCash Portfolio Management System.” OOPSLA ‘92 Experience Report. https://c2.com/doc/oopsla92.html ↩
  10. Kaley, A. (2018, November 11). “UX Debt: How to Identify, Prioritize, and Resolve.” Nielsen Norman Group. https://www.nngroup.com/articles/ux-debt/ ↩